Vietnam's Côn Đảo Archipelago Unveils 2030 Eco-Tourism Master Plan Featuring 5.5km Cable Car System and 90,000 Visitor Cap
Vietnam's Côn Đảo National Park has approved a revised 2030 eco-tourism master plan incorporating a 5.5km inter-island cable car system, 19 forest trails, a 100-hectare marine zone, and an annual cap of 90,000 visitors.

Image generated by AI
Vietnam’s Bà Rịa–Vũng Tàu provincial authorities have approved the updated eco-tourism and environmental development master plan for Côn Đảo National Park through 2030. The strategy introduces a 5.5-kilometer inter-island cable car network, 19 designated eco-tourism routes, and a 100-hectare high-tech marine zone, while establishing an annual carrying capacity limit of 90,000 visitors to safeguard the archipelago's forest and marine biodiversity.
The multi-phase plan focuses on controlled eco-resort development beneath forest canopies, electric shuttle transit, and low-impact infrastructure designed to connect main island Côn Sơn with smaller surrounding islets while maintaining strict conservation boundaries across 905.9 hectares of designated tourism sites.
[ Côn Đảo Eco-Tourism 2030 Network ]
│
┌────────────────────┼────────────────────┐
│ │ │
5.5km Cable Cars 19 Eco Trails 100ha Marine Zone
(Inter-Island) (293.5km Total) (Near Hòn Trọc)
Côn Đảo 2030 Master Plan: Key Infrastructure & Conservation Parameters
The updated master plan balances targeted infrastructure investments with strict ecological caps to prevent over-tourism across Côn Đảo National Park.
CÔN ĐẢO NATIONAL PARK 2030 DEVELOPMENT MATRIX
| Column 1 |
|---|
| Annual Visitor Capacity Cap: 90,000 Visitors per year by 2030 |
| Target International Share: 30% – 35% of Total Arrivals |
| Inter-Island Cable Car Network: 2 Planned Routes (~5.5 km Combined Length) |
| Eco-Tourism Routes: 19 Routes (~293.5 km Total Length) |
| High-Tech Marine Farming Zone: 100 Hectares (Located near Hòn Trọc) |
| Total Tourism Site Area: 905.9 Hectares (885.9 ha Forest / 20 ha Marine) |
Data from the Vietnam National Authority of Tourism and the Côn Đảo National Park Management Board outlines the core parameters of the project:
- Inter-Island Aerial Transit: Two cable car lines totaling 5.5 kilometers will connect Côn Sơn with nearby islets. Supporting utility lines (electricity, water, communications) will be buried underground along cable corridors to prevent forest clearing.
- Forest Trail Modernization: 17 of the 19 planned eco-tourism routes (spanning 293.5 km) will utilize existing ranger patrol paths. The 4-kilometer Ma Thiên Lãnh–Đất Thắm–Bãi Bàng forest route will be upgraded for quiet electric shuttle carts, providing access to heritage trees and Bãi Bàng Waterfall.
- Marine Protection & Aquaculture Zone: A 100-hectare marine zone near Hòn Trọc will combine eco-tourism diving tours with sustainable high-tech aquaculture demonstration projects.
| Development Component | Technical Specification | Ecological Purpose |
|---|---|---|
| Inter-Island Cable Car | 2 routes (~5.5 km combined) | Reduces marine engine noise & boat traffic between islets |
| Eco-Tourism Trails | 19 routes (293.5 km total) | Reuses 17 existing ranger patrol paths without new logging |
| Electric Transit Trail | 4 km Ma Thiên Lãnh–Bãi Bàng | Electric shuttles for zero-emission visitor transport |
| Marine Zone (Hòn Trọc) | 100 hectares | Combines sustainable fish farming with dive tourism |
| Development Sites | 20 sites (905.9 ha total) | Low-density canopy leases capped at 90,000 visitors/yr |
Traveler Logistics Guide: Getting to Côn Đảo Archipelago
Reaching the secluded Côn Đảo archipelago requires navigating specialized regional air or high-speed sea ferry routes from mainland Southern Vietnam.
CÔN ĐẢO TRAVELER LOGISTICS & ACCESS MATRIX
| Air Access (Côn Đảo Sỏ Ống VCS): Flights from Ho Chi Minh City (SGN) & Hanoi (HAN) |
|---|
| Express Speedboat (Vũng Tàu): 2.5 to 3-hour sea voyage to Bến Dam Port |
| Express Speedboat (Sóc Trăng): 2-hour catamaran voyage from Trần Đề Port |
| National Park Entry Fee: NPR 60,000 VND (~$2.40 USD) per visitor |
1. Flights to Côn Đảo Airport (VCS)
Côn Đảo Airport (Co Ong Airport / VCS) is located on the northeastern shore of Côn Sơn Island.
The Vietnamese government has officially announced the 2030 Eco-Tourism Master Plan for Côn Đảo Archipelago, which includes the development of a 5.5km cable car system to reduce the archipelago's carbon footprint. According to the Vietnam National Administration of Tourism, this initiative aims to promote sustainable tourism while preserving the archipelago's natural beauty. The plan is expected to enhance the overall tourist experience, making Côn Đảo a more attractive destination for eco-tourists.
- Direct Air Routes: Regional turboprop ATR-72 and Embraer E190 aircraft operated by Vietnam Airlines and VASCO connect Côn Đảo with Ho Chi Minh City (SGN, 45 mins) and Hanoi (HAN, 2 hrs 15 mins).
- Luggage Restrictions: Due to runway length constraints, strict baggage weight allowances are enforced. Travelers should book flights well in advance during peak dry season (December to April).
2. High-Speed Express Sea Ferries
- Vũng Tàu Gateway: Côn Đảo Express catamarans depart Cầu Đá Port in Vũng Tàu directly to Bến Đầm Port in Côn Đảo (approx. 3 hours).
- Sóc Trăng Gateway: Superdong speedboats operate 2-hour daily crossings from Trần Đề Port in Sóc Trăng Province, offering the shortest sea passage.
Environmental Guidelines for Visitors
To protect Côn Đảo's status as a sea turtle nesting sanctuary and dugong habitat, visitors must comply with National Park regulations:
- Turtle Nesting Season (May to October): Night visits to nesting beaches (such as Hòn Bảy Cạnh) require a registered National Park ranger guide. No artificial flashlights or white lights are permitted on beaches.
- Waste Management & Plastics: Single-use plastics are restricted within National Park boundaries. Visitors are required to pack out all non-biodegradable waste.
Frequently Asked Questions (FAQ)
What is the visitor cap set for Côn Đảo under the 2030 Master Plan?
The revised master plan caps total visitor capacity at 90,000 arrivals annually by 2030, with 30% to 35% targeted toward international eco-tourists.
How long is the planned Côn Đảo cable car system?
The planned cable car network consists of 2 routes with a combined length of approximately 5.5 kilometers, connecting Côn Sơn Island to surrounding islets.
How do travelers reach Côn Đảo from mainland Vietnam?
Travelers can fly directly to Côn Đảo Airport (VCS) from Ho Chi Minh City or Hanoi, or take high-speed express catamarans from Vũng Tàu (3 hours) or Sóc Trăng (2 hours).
What attractions are accessible along the upgraded Ma Thiên Lãnh forest trail?
The upgraded 4-kilometer electric shuttle trail provides access to Bãi Bàng Waterfall, Đất Thắm Beach, ancient heritage trees, and forest canopy bird-watching stations.
Related Travel Guides
- Finnair Shines As Premium Travel Champion After Winning Northern Europe’s Best Airline Crown Once Again
- Zanzibar Tourism Economy Report 2026: Record $912 Million Current Account Surplus Driven by 95% Service Export Share
- Greece Sustainable Underwater Tourism Report 2026: Eco-Friendly Diving and Marine Conservation Initiatives
Disclaimer
This article is for informational and educational purposes only. It does not constitute legal, financial, or professional advice. While we strive to provide accurate and up-to-date information, travel policies, regulations, and conditions change rapidly. Always verify information with official sources before making travel decisions. Nomad Lawyer makes no representations about the accuracy, reliability, completeness, or suitability of the information provided. Readers should consult qualified professionals for advice specific to their circumstances. The views expressed in this article are those of the author and do not necessarily reflect the views of Nomad Lawyer.

Kunal K Choudhary
Co-Founder & Contributor
A passionate traveller and tech enthusiast. Kunal contributes to the vision and growth of Nomad Lawyer, bringing fresh perspectives and driving the community forward.
Learn more about our team →