Saudi Arabia Railways Orders 10 Additional Stadler Trains for CHF 300 Million to Upgrade Riyadh-Dammam Corridor
Saudi Arabia Railways exercises a CHF 300 million option with Stadler for 10 more next-generation passenger trains to transform the busy Riyadh-Dammam line.

SAR has expanded its Stadler contract to 20 trainsets, scheduled to enter passenger service on the Riyadh–Dammam corridor in 2029.
Saudi Arabia Railways (SAR) has finalized a CHF 300 million agreement with Swiss train manufacturer Stadler Rail to acquire ten additional next-generation intercity passenger trainsets, doubling its procurement to 20 modern trainsets for the key Riyadh–Dammam rail corridor. Exercising a contractual expansion option from its initial February 2024 order, the national railway operator aims to significantly boost intercity seating capacity, passenger frequencies, and travel comfort across Saudi Arabia’s central and eastern provinces ahead of targeted commercial operations in the second half of 2029.
The expanded rolling stock agreement includes comprehensive long-term maintenance support, reinforcing Saudi Arabia’s Vision 2030 objective to transition domestic and international visitor mobility toward sustainable, high-capacity public rail infrastructure linking the capital with the Arabian Gulf coastline.
Fleet Procurement and Corridor Milestone Overview
The Riyadh–Dammam railway represents one of the kingdom’s most established passenger rail arteries, serving vital intermediate population centers including Hofuf (Al-Ahsa oasis) and Abqaiq before reaching the coastal commercial hub of Dammam.
| Contract & Operational Dimension | Confirmed Specification |
|---|---|
| National Railway Operator | Saudi Arabia Railways (SAR) |
| Rolling Stock Manufacturer | Stadler Rail |
| Contract Value (Option Exercised) | CHF 300 million (~SAR 1.3 billion) |
| Total Stadler Fleet Ordered | 20 intercity passenger trainsets (10 in Feb 2024 + 10 in Oct 2026) |
| Primary Rail Corridor | Riyadh – Hofuf – Abqaiq – Dammam (East Train Network) |
| Testing & Demonstration Debut | 2028 |
| Target Commercial Passenger Launch | Second half of 2029 (H2 2029) |
| Engineering Environmental Standard | European Stage V low-emission certification |
| Specialized Climate Adaptation | Desert heat barriers, sand filtration, and dual redundant cooling |
The procurement contract doubles the number of high-capacity trainsets assigned to the eastern rail route, ensuring robust fleet resilience across seasonal peaks such as Eid holidays and winter tourism festivals.
Desert Engineering and Modern Passenger Comfort
Operating across the Arabian desert requires specialized engineering solutions to withstand extreme ambient temperatures exceeding 50°C and pervasive fine sand drifts. Stadler is developing these bespoke trainsets with rugged technical systems tailored to Gulf climates:
- Advanced Aerodynamic Sand Filtration: Multi-stage centrifugal air intakes and specialized filtration prevent desert dust from infiltrating traction motors and sensitive electronics.
- Redundant HVAC Climate Systems: Dual-compressor climate control architecture ensures passenger coaches maintain stable, chilled interior temperatures even during peak summer heatwaves.
- Multitier Travel Classes: Configured with luxury first-class suites, business-class lounges, and comfortable family-friendly standard seating equipped with universal charging docks and high-speed Wi-Fi.
- Ample Luggage Accommodations: Generous overhead and end-car baggage zones specifically dimensioned to support long-haul international air-rail transfer travelers and family groups.
Expanding Passenger Demand and Vision 2030 Tourism Synergy
The rail investment directly mirrors surging travel numbers across Saudi Arabia. Official statistical data from the Ministry of Tourism highlights rapid growth across both domestic and overseas leisure segments:
| Tourism Performance Metric | Reported 2025 Volume | Economic / Market Impact |
|---|---|---|
| Total Annual Visitors | 123.0 million travelers | 6.0% overall growth compared to 2024 |
| Inbound International Travelers | 29.3 million visits | SAR 176.6 billion inbound expenditure |
| Domestic Leisure & Business Trips | 93.3 million visits | SAR 127.1 billion domestic spending (+8.3%) |
| Combined Tourism Expenditure | SAR 303.7 billion | Direct tourism contribution reaches 4.9% of GDP |
| Sector Employment | 1.03 million tourism jobs | Supported by Tourism Development Fund investments |
Enhanced rail frequencies will allow international travelers holding Saudi eVisa permits to explore beyond Riyadh's urban centers, taking rail day-trips to the UNESCO World Heritage-listed date palm groves of Al-Ahsa Oasis in Hofuf or onward to maritime resorts in the Eastern Province.
Practical Guidance for Current Rail Travelers
While the new Stadler trains are scheduled to begin commercial passenger operations in late 2029, current travelers along the Riyadh–Dammam line should take note of present operational parameters:
- Current Service Schedules: Daily passenger journeys continue operating under SAR's existing East Train timetable using current diesel locomotive sets; reservations should be secured via the official SAR portal or mobile app.
- Luggage and Station Check-In: Standard baggage allowances mandate check-in screening at Riyadh and Dammam stations at least 30 minutes prior to departure.
- Tourist eVisa Entry: International tourists can utilize Saudi Arabia’s one-year, multiple-entry eVisa (which permits stays up to 90 days) to travel freely across the national rail network.
Related Travel Guides
- JR East Unveils First Public Interior Tour of Converted Freight Shinkansen at Sendai Station
- UK Rail Disruption: Southeastern Truncates Hastings to London Trains at Tonbridge Due to Track Defect
- India Prioritises ₹9,000 Crore Rangpo-Gangtok Railway Extension as Sikkim Targets Major Himalayan Tourism Transformation
Frequently Asked Questions
When will the new Stadler trains enter service between Riyadh and Dammam?
The new Stadler trainsets are scheduled to begin operational demonstration runs in 2028 and enter commercial passenger service in the second half of 2029.
How much did Saudi Arabia Railways pay for the additional trains?
SAR exercised a contract option valued at approximately CHF 300 million (~SAR 1.3 billion) for ten additional trainsets, doubling its total Stadler fleet to 20 units.
Which intermediate stations do the trains serve on this corridor?
The intercity line links Riyadh with Hofuf (Al-Ahsa Oasis) and Abqaiq before reaching its eastern terminus at Dammam.
How are the new trains adapted for Saudi Arabia's desert climate?
The trainsets incorporate specialized multi-stage sand filters, sealed traction equipment, and dual redundant cooling systems designed to withstand temperatures above 50°C.
Disclaimer
This article is for informational and educational purposes only. It does not constitute legal, financial, or professional advice. While we strive to provide accurate and up-to-date information, travel policies, regulations, and conditions change rapidly. Always verify information with official sources before making travel decisions. Nomad Lawyer makes no representations about the accuracy, reliability, completeness, or suitability of the information provided. Readers should consult qualified professionals for advice specific to their circumstances. The views expressed in this article are those of the author and do not necessarily reflect the views of Nomad Lawyer.

Preeti Gunjan
Contributor & Community Manager
A passionate traveller and community builder. Preeti helps grow the Nomad Lawyer community, fostering engagement and bringing the reader experience to life.
Learn more about our team →